Tentative Work Schedule

April 25, 2022

 

Work in the NE section consists of Opening up Culverts on NE 185th St., Mowing ROW on NE 19th Ave. and Mowing NE 17th Ave. and NE 19th Ave.

 

Work in the NW section consists of Grading NW 110th Ave. NW 45th Ave. and NW 199th St.

 

Work in the SE section consists of Digging the ditch around a curve on SE 25th and Patching Pot Holes on SE 28th St.

 

Work in the SW section consists of Grading SW 132nd Ave. and Cutting a high spot out of a curve on SW 92nd St.

 

 

We received 1 DOC (BCSO-JAIL) Officer and 4 Inmates and they will be Picking up Trash and Weed Eating on NE 173rd St. and NE 28th Ave.