Tentative Work Schedule

October 14, 2020

 

Work in the NW section consists of Grading NW 74th Ave. & NW 215th Way, Mowing ROW on NW 75th Ave. and Patching Pot Holes on NW 182nd Way & NW 219th St.

 

Work in the SW section consists of Spraying Fog Seal on SW 106th Ave., Grading SW 105th, Chipping, Mulching and opening up culverts on SW CR 235, Trimming Trees and Mulching limbs on SW CR 231 and Mowing SW CR 18 & SW CR 225A

 

 

We received 2 DOC Squads with a total of 7 people

 

Both Squads will be assisting with Chipping on SW CR 235