Tentative Work Schedule

June 27, 2023

 

Work in the NE section consists of Mowing NE 19th Ave., NE 173rd St and NE 28th Ave. and Weed eating NE 14th Ave.

 

Work in the NW section consists of Grading NW 251st, Carter Road and Roads off of NW CR 125 and Patching Holes in road at Lawtey Bridges 

 

Work in the SE section consists of Grading SE 73rd St. SE 72nd St. and SE 71st St., Spreading Limerock on SE 38th Ave. and Filling in and Repairing SE 73rd St.

 

Work in the SW section consists of Grading SW 137th St.

 

We received 1 DOC (BCSO) Officer and 4 Inmates and they will be Weed Eating a big ditch and Mowing with a Zero Turn in Connerly Estates