Tentative Work Schedule

November 4, 2019

 

Work in the NW section consists of Grading NW 75th and NW 185th, Digging the Outfall Ditch on NW CR 225 and Patch Driveway on NW 216th St.

 

Work in the SE section consists of Grading SE 59th Ave., SE 125th and Crystal Lake Homesites, Mow SE CR 100A, SE 150th and SE 52nd (Lake Access) and Patch troughs SE 144th St.

 

Work in the SW section consists of Grading SW 163rd St., SW 155th St. and SW 132nd and Mowing SW CR 18 (Sampson City to 301)

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be Weed Eating and Cleaning out the ditch pavings on SW CR 231 (Dedan Loop)

 

1 Squad will be Working around the Shop re-stacking Concrete bags, pouring concrete and Cleaning up yard