Work Schedule

 

Work in the NW section will consist of Zipping a Road, Grading, Digging out ditches, Blowing out culverts and Mowing limbs on ROW

 

Work in the SE section will consist of Blowing out culverts and crossover pipes

 

Work in the SW section will consist of Grading, Lime rocking a road and Patching pot holes

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be chipping limbs and debris in SE

 

1 Squad will be directing traffic and picking up trash in the NW

 

1 Squad will be picking up trash, weed eating and mowing in the NE

 

 

1 Squad from The Transition House (1 person) will be patching pot holes in the SW