Tentative Work Schedule

August 3, 2021

 

Work in the NE section consists of Grading NE 19th Lane

 

Work in the NW section consists of Mowing NW CR 235 and Patching Pot Holes at 18432 NW 67th Ave.

 

Work in the SE section consists of Grading SE 11th Ave. and in Crystal Lake Homesites

 

Work in the SW section consists of Grading SW 101st Ave. and SW 106th, Mowing SW CR 235, Patching Pot Holes at 13636 SW CR 227, Mowing a ditch and Picking up tree debris on SW CR 235A and Picking up a tree and tree debris at the intersection of SW CR 227 & SW CR 18

 

 

We received 2 DOC (BCSO-JAIL) Squads and a total of 5 Inmates

 

1 Squad with 2 Inmates will be Filling in around a culvert on SW CR 235A

 

1 Squad with 3 Inmates will be Picking up trash on SW CR 235