Tentative Work Schedule

March 25, 2019

 

Work in the NE section consists of Grading NE 171st St.

 

Work in the NW section consists of Digging the ditch (Cooksey) on NW 53rd Ave., Install culverts on NW 35th Ave. & NW 178th Loop and Patching driveways in Pleasant Grove 

 

Work in the SE section consists of Grading roads off SE CR 18 from Hampton to SE SR 100 and Patching pot holes on SE 136th

 

Work in the SW section consists of Grading 6 mile cut off and Filling in shoulders on W CR 18

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Picking up trash and weed eating on NW CR 225

 

1 Squad will be Patching pot holes on SE 136th and Driveways in the Pleasant Grove area

 

1 Squad will direct traffic for Installing culverts on NW 35th Ave. and on NW 178th Loop