Tentative Work Schedule

August 4, 2022

 

Work in the NW section consists of Grading NW 193rd St, and NW 74th Ave.

 

Work in the SE section consists of Grading SE 129th St. and Mowing SE 109th St., SE 21st Ave. and SE CR 100A

 

Work in the SW section consists of Patching Troughs on the Shoulders of SW CR 235

 

 

We received 1 DOC (BCSO-JAIL) Officer with 3 Inmates and will be performing Traffic Control on SW CR 235