Tentative Work Schedule

April 2, 2024

 

Work in the NE section consists of Cleaning Bulkhead on NE 154th St. and Mowing the Sidewalks in the Country Club area with Zero Turns

 

Work in the NW section consists of Grading NW 215th Way and at the Market Road Pit

 

Work in the SE section consists of Grading SE 129th St., SE 25th Terr., SE 36th Loop and SE 17h Ave.

 

Work in the SW section consists of Mowing the Shoulders of the Road on SW 163rd St.

 

We will be Loading and Hauling Dirt to the New River Solid Waste Landfill

 

We will fix the Sign by the Hospital

 

 

We received 2 DOC (BCSO-JAIL) Officers and 2 Inmates.

 

1 Officer will be Assisting in Maintenance

 

1 Officer and 2 Inmates will be Picking Up Trash on NE 28th Ave.