May 3, 2021

 

Work in the NW section consists of Prepping NW 219th St., Opening up Crossover pipe and ditches on NW CR 233 and NW 44th and Mow ROW on NW 71st Ave.

 

Work in the SE section consists of Patching Pot Holes on SE 80th Ter. and Mowing SE 8th Ave. sidewalk and Landfill

 

Work in the SW section consists of Grading SW 92nd Ave., SW 105th, SW 120th and SW 132nd Ave.