Tentative Work Schedule

October 11, 2018

 

Work in the NW section consists of Building up the intersection of NW 75th Ave. and NW CR 225, Pulling ditches and filling holes on NW 75th Ave. and Patching pot holes on NW 177th

 

Work in the SE section consists of Digging a ditch on SE 21st Ave., Patching pot holes on SE 66th St. and Trimming trees on SE 15th Ave.

 

Work in the SW section consists of Mowing SW 114th with the side Arm and Blowing out a culvert on SW 161st St.

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be Patching pot holes on NW 177th & SE 66th St.

 

1 Squad will be Trimming Trees on SE 15th Ave.

 

1 Squad will be performing traffic control for digging a ditch on SE 21st Ave.