Tentative Work Schedule

November 14, 2018

 

Work int he NE section consists of Pulling ditches on NE 12th Ave.

 

Work in the NW section consists of Zipping and Digging Ditches on NW 84th Ave.

 

Work in the SE section consists of Mowing SE 31st St. and Crystal Lake Homesites area with the Side Arm Mower

 

Work in the SW section consists of Patching a driveway on SW CR 227  and Mowing SW CR 231 and SW CR 237

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be patching a driveway at 13636 SW CR 227

 

1 Squad will be Weed eating and Picking up trash on NW CR 225

 

1 Squad will be directing traffic for digging ditches on NW 84th Ave.