Tentative Work Schedule

April 4, 2019

 

Work in the NE section consists of Patching pot holes and driveways on NE 20th Ln.

 

Work in the NW section consists of Grading NW 193rd, NW 75th, NW 85th & NW 188th, Grading with Road Boss NW 62nd & NW 177th, Patching driveways on NW 177th and Digging the ditch on NW 53rd Ave

 

Work in the SE section consists of Grading SE 11th Ave., SE 43rd, SE 41st., SE 38th, SE 33rd., SE 16th, Patching pot holes and driveways on SE 24th Way and SE 15th Ave. and Cleaning out ditches on SE CR 18, SE 137th Ter. & SE 44th Ave.

 

Work in the SW section consists of Patching pot holes on SW 64th, SW 65th & SW 160th

 

 

We received 3 DOC squads for a total of 12 people

 

1 Squad will be Patching pot holes and driveways on NE 20th Ln and NW 177th

 

1 Squad will be Patching pot holes and driveways on SE 24th Way, SE 15th Ave., SW 64th, SW 65th. & SW 160th

 

1 Squad will directing traffic for Cleaning out ditches on SE CR 18, SE 137th Ter. and SE 44th Ave.