Tentative Work Schedule

September 17, 2019

 

Work in the NE section consists of Mowing Carter Road

 

Work in the NW section consists of Building a parking lot at the  Heilbron Springs Fire Department

 

Work in the SE section consists of Grading SE 16th, SE 9th, SE 87th & SE 38th and down SE CR 18 and Installing a Crossover pipe on SE CR 18A

 

Work in the SW section consists of Grading SW 85th Lane, SW 160th, SW 147th, SW 92nd, SW 106th and SW 104th (Milled part), Patch Pot Holes at 9425 SW 68th Pl., Patch troughs on SW CR 18 and Mow SW CR 18, SW CR 231 (Dedan Loop), SW CR 227 & SW CR 225

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be directing traffic for patching pot holes on SW 68th Pl. and troughs on SW CR 18

 

1 Squad will be Weed eating and Picking up trash on all of Market Road from 301 to 16

 

1 Squad will be directing traffic for Installing a Crossover pipe on SE CR 18A