Tentative Work Schedule

December 15, 2020

 

Work in the NE section consists of Patching holes on culvert on NE CR 125 and Zero Turns mowing NE CR 125

 

Work in the NW section consists of Spreading limerock and Grading NW 105th Ave., Shoulder work on NW 225, Patch Pot Holes on NW 177th St., Mowing on NW CR 125 and Push limerock on Driveway on NW 36th Ave.

 

Work in the SE section consists of Spraying SE 46th Ave. and Mowing the ROW on SE 21st Ave. and the roads off of it.

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Weed eating the Pond on SW CR 225, Picking up trash and weed eating SW CR 225 and Picking up a mattress on SW CR 237

 

1 Squad will be assisting with Patching holes on a culvert on NE CR 125 and on NW 177th St.