Tentative Work Schedule

July 14, 2021

 

Work in the NE section consists of Mowing with Zero turns on NE 17th Ave. and NE 14th Ave

 

Work in the NW section consists of Grading NW 127th St., NW 110th , NW 251st, NW 238th and NW 25th and Pushing up Limerock at the Market Road pit

 

Work in the SE section consists of Grading SE 16th Ave., SE 94th and SE 87th, Cleaning out and Opening up the ditch on SE 50th St, and Mowing SE CR 100A, SE CR 230A and SE 150th

 

Work in the SW section consists of Grading SW 132nd Pl

 

 

We received 2 DOC (BCSO-JAIL) Squads and 5 inmates 

 

1 Squad will be patching Pot holes on NW 84th Ave.

 

1 Squad will be Picking up trash on SE 144th (Vystar Road) and SE CR 100A