Tentative Work Schedule

June 29, 2023

 

Work in the NW section consists of Patching Pot Holes on NE 7th Ave

 

Work in the NW section consists of Grading NW 25th Ave., NW 238th St. and NW 44th Ave., Breaking up Beaver Dams in Lawtey, Mowing NW CR 229 and NW CR 229A and Patching Pot Holes on NW 62nd Ave. off of NW 200th St., NW 177th St. and NW 44th Ave.

 

Work in the SE section consists of Grading SE 46th Loop, SE 31st St. and SE 1st Ave. and Patching Pot Holes on SE 27th Loop, SE 21st Ave., SE 57th St. and SE 48th Ave.

 

Work in the SW section consists of Grading SW 105th, SW 92nd and SW 106th