Tentative Work Schedule

December 18, 2018

 

Work int he NE section consists of working materials into the milling on NE 204th St.

 

Work in the NW section Mowing NW 251st St. and Installing a culvert at 3901 NW CR 233

 

Work in the SE section consists of Grading SE 31st and Patching pot holes on SE 52nd

 

Work in the SW section consists of Grading SW 155th and SW 136th and Grading SW 101st Ave. with the Road Boss

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be patching pot holes and driveways on SE 52nd 

 

1 squad will be picking up trash and weed eating on SE 8th Ave.

 

1 Squad will be directing traffic for installing a culvert at 3901 NW CR 233