Work Schedule

 

Work in the NW consists of Pulling ditches & Milling, Grading, Pull ditch/Scoop ditch, Chip limbs and brush and Mow

 

Work in the SW consists of Grading and Lime rocking a road

 

 

We received DOC Squads for a  total of 10 people

 

1 Squad Will be assisting Chipping limbs and brush in the NW

 

1 Squad will be handling traffic control in the NW

 

 

1 Squad from The Transition House (3 people) will be patching pot holes in the SW and Cut a pipe so water will run off in the NE