Tentative Work Schedule

October 17, 2018

 

Work in the NE section will consists of Grading NE 205th, 227th & 6th Ave. (Carter Rd.), Install a culvert on NE 185th St. and Move equipment to Strawberry Acres to get ready to Pull ditches 

 

Work in the NW section consists of Pulling ditches on NW 75th Ave., Grading the Whitehead Settlement area, Re-set a culvert on NW 45th, Grade NW 219th, Mow NW CR 229 to bridge then towards town and Move equipment to NW 84th Ave. to get ready to Scoop ditches

 

Work in the SW section consists of Grading SW 106th, Scoop and rock SW 65th Ave. (Crosby Lake Boat Ramp area) and Trim over head limbs and Mow the side of the road of SW 66th with the Side Arm and Mow SW 101st with the Side Arm

 

 

We received 2 DOC Squads for a total of 13 people

 

1 Squad will be directing traffic for Scooping ditches and rocking at Crosby Lake Boat Ramp area then moving to NW 84th to get ready to Scoop ditches there

 

1 Squad will be trimming over head limbs on SW 66th