Tentative Work Schedule

June 12, 2023

 

Work in the NW section consists of Grading NW 211th St, NW 196th St. and NW 185th St.

 

Work in the SE section consists of Cleaning out Box Culvert on SE CR 18, Mowing SE CR 214, SE 5th Ave. and SE 57th St., Patching Pot Holes at the apron on SE 59th @ 301 and Working at the Keystone Airport

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St., Patching Pot Holes at SW 75th Pl. and the Apron at SW 160th @ SW CR 18 and Mowing SW 87th St., SW 137th and SW 101st