Work Schedule

 

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Packing a road, Grading, Mowing and Taking trees out of ditches

 

Work in the SW section consists of Back filling a ditch

 

 

We received 2 DOC Squads for a total of 12 people

 

 

1 Squad will be removing trees from ditches in the NW

 

1 Squad will be Patching troughs in SW