Tentative Work Schedule

November 25, 2020

 

Work in the NW section consists of Grading NW 41st and NW 219th (301 to NW CR 200A), Shoulder work on NW CR 225, Patch driveways on NW 247th St. and Mow NW R 235

 

Work in the SE section consists of Prepping SE 35th Ave.

 

Work in the SW section consists of Mowing SW CR 235

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Picking up trash and weed eating SW CR 18 (Starting at Dedan Loop and Collection Site)

 

1 Squad will be Picking up trash and weed eating on NW CR 125

 

1 Squad will be assisting with Patching driveways on NW 247th St.