Tentative Work Schedule

July 27, 2022

 

Work in the NW section consists of Mowing the Library Pond and the Pond across the street from the Library.

 

Work in the SE section consists of Grading SE 43rd Ave., SE 41st Ave. and SE 36th Ave., Cleaning out the ditches on SE 26th Ave., Mowing the ROW on SE 144th St. and SE 20th Ave., Mowing the sidewalk on SE CR 21B with the Zero Turn and Picking up Tree debris on SE CR 221

 

Work in the SW section consists of Grading SW 92nd Ave. and SW 120th Ave., Mowing SW CR 18 and SW CR 231 and Picking up Tree debris on SW CR 18

 

 

We received 2 DOC (BCSO-JAIL) Officers and total of 4 Inmates 

 

1 Officer will be assisting Maintenance

 

1 Squad with 4 Inmates will be Weed Eating the Ditches on NW 177th St. and NW 62nd Ave.