Work Schedule

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Zipping a road, Scooping Ditches and Cleaning out Ditches

 

Work in the SE section consists of Cleaning out a Pond

 

Work in the SW section consists of Grading, Grading milled roads and Patching troughs

 

 

We received 2 DOC Squads for a total of 13 people

 

1 Squad will be Cleaning out Ditches in the NW

 

1 Squad will be Patching troughs in the SW