Tentative Work Schedule

 

July 26, 2018

 

Work in the NE section consists of Digging a ditch on NE 14th Ave. and fixing ruts in ditch on NE 15th Ave.

 

Work in the NW section consists of Building up NW 41st Ave. and Patching pot holes on NW 84th Ave.

 

Work in the SE section consists of Digging the ditches in Lincoln City

 

Work in the SW section consists of Zipping SW 101st Ave., Finish digging ditch on SW CR 225A, Patching pot holes on SW 85th Lane and Trimming and Chipping intersection of SW CR 227 & SW CR 18

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be patching pot holes on SW 85th Lane and NW 84th Ave. 

 

1 Squad will be Trimming and Chipping limbs at the intersection of SW CR 227 & SW CR 18

 

1 Squad will be traffic control for Digging the ditch on SW CR 225A then patching pot holes on SE 21st Ave.