Tentative Work Schedule

 

Work in the NW section consists of Installing 4 culverts at 20953 NW 55th Ave., Pull ditches on NW 205th, Mow NW 216th, 200B, CR 125 and the Side Arm Mower on NW 219th an 215th Way and Blowing out 4 culverts at  6330 NW CR 125 

 

Work in the SE section consists of continuing to Mill SE 66th St.

 

Work in the SW section consists of  Patching pot holes on SW CR 235

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be assisting in patching pot holes on SW CR 235

 

1 Squad will be picking up trash and weed eating on NW 216th St.

 

1 Squad will be conducting traffic control while blowing out 4 culverts at 6330 NW CR 125