Work Schedule

 

 

Work in the NW section will consist of Mowing and Cutting, Trimming and Chipping

 

Work in the SE section will consist of Zipping a road

 

Work in the SW section will consist of Milling a road

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be assisting in Cutting, Trimming and Chipping in the NW

 

1 Squad will be picking up trash and weed eating in the NW

 

1 Squad will be assisting with traffic in the SW

 

 

1 Squad from The Transition House ( 4 people) patching driveways in the SW