Work Schedule

 

Work in the NE section consists of Installing Crossover pipes and Patching pot holes

 

Work in the NW section consists of Milling, Grading, Chipping limbs, Mowing and Patching pot holes

 

Work in the SE sections consists of Grading

 

Work in the SW section consists of Grading, Milling a road and manicuring area at bridge

 

 

We received Squads for a total of 14 people

 

1 Squad will assist with Chipping limbs in the NW

 

1 Squad will assist with installing Crossover pipes in the NE

 

1 Squad will direct traffic for a Contractor at the bridge on NW CR 225

 

 

1 Squad from The Transition House (3 people) will assist in manicuring a bridge in SW and Patching pot holes in the NE & NW