Work Schedule

 

Work in the NW section consists of Pulling & Milling a road, Pulling & Scooping a ditch, Chipping limbs and brush and Mowing

 

Work in the SE consists of Patching washouts

 

Work in the SW consists of Grading and Pulling and lime rocking a road

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be chipping Limbs and Brush in NW

 

1 Squad will be assisting with Traffic Control in NW

 

 

1 Squad from The Transition House (3 people) will be patching driveways