Tentative Work Schedule

February 23, 2022

 

Work in the NE section consists of Grading NE 12th and NE 173rd, Dig ditches at NE 154th Tr. and NE 17th Ave. and Mowing ROW on roads off of 301 going North

 

Work in the NW section consists of Grading NW 71st Ave., Cleaning out a ditch on NW 178th Loop, Picking up trash on NW 75th and Patching a Driveway on NW CR 125

 

Work in the SE section consists of Patching Pot Holes on SE 136th St.

 

Work in the SW section consists of Grading and Watering SW 106th and Mowing SW CR 231 (Dedan Loop)

 

Monitor Pump at Brush Fire location on SE CR 100A and get Surplus Vehicles and Equipment ready and listed on Gov Deals for auction

 

 

We received 2 DOC (BCSO-JAIL) Officers with a total of 4 Inmates

 

1 Squad with 2 Inmates will be Cleaning and Picking up Trash at County Owned Parks and Boat Ramps

 

1 Squad with 2 Inmates will be Picking up Trash on NE 173rd