Work Schedule

 

Work in the NW section consists of Milling a road, Chipping limbs and Patching driveways

 

Work in the SE section consists of Grading and Patching driveways

 

Work in the SW section consists of Filling in ditches and Over lay milling and Pulling ditches

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will assist with Chipping limbs in the NW

 

1 Squad will be picking up trash and weed eating in NW

 

1 Squad will be Picking up trash and weed eating in SW

 

 

1 Squad from The Transition House (2 people) will be patching driveways in the NW & SE