Tentative Work Schedule

October 3, 2018

 

Work in the NW section consists of Pulling ditches on NW 49th and 213th, Trim limbs on NW CR 225 in front of Old Lawtey P.O. and Mow NW 214th with the Side Arm

 

Work in the SE section consists of Grading SE 38th, 46th Loop and off of SE 57th (Immokalee Road) and Patching pot holes on SE 26th Ave. and SE 35th

 

Work in the NW section consists of Milling the back part of SW 104th, Grading SW 163rd, 136th Way, SW 87th, 66th, 105th, 92nd & 147th and Chipping debris in Brooker

 

 

We received 3 DOC Squads for a total of 20 people

 

1 Squad will be patching pot holes on SE 26th and SE 35th

 

1 squad will be trimming limbs over NW CR 225 near Old Lawtey Post Office then Finish Chipping in Brooker

 

1 Squad will be weed eating and picking up trash on NW 71st (all sections), NW 38th, SE 21st and SE 94th