Work Schedule

September 7, 2017

 

Work in the NE section consists of Pulling ditches on NE 171st St. and Picking up thrown out chair on NE 213th

 

Work in the NW section consists of Grading, Pulling ditches on NW CR 229, Taking down tree on NW CR 229A and Removing dirt from the parking lot at the Lawtey Park

 

Work in the SE section consists of Grading, Picking up couches & chairs on SE 144th (Old Asphalt plant) and Patching driveways

 

Work in the SW section consists of Grading, Mowing and Picking up debris on SW CR 231

 

 

We hauled 19 loads of Sand from DuPont to the City of Lawtey, Sampson City Fire Department, Heilbronn Springs Fire Department and BCRD's Market Road pit

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad with Charles picking up debris and taking down tree.  ***DOC officer called at 9:50am and all squads were called to go back to the Institution

 

1 Squad to Weed eat on SE 21st Ave.

 

1 squad to perform traffic control on NW CR 229

 

1 Squad from Transition House (5 people) to patch driveways on SE 8th Ave. 

 

***DOC officer called at 9:50am and all squads were called to go back to the Institution