Tentative Work Schedule

June 15, 2023

 

Work in the NW section consists of Grading NW 219th Ter., NW 70th Ave. and NW 212th St., Cleaning out a Ditch on NW CR 225 and Mowing Pratt Street Pond with the Zero Turn

 

Work in the SE section consists of Grading SE 46th Loop, SE 1st Ave. and SE 31st St. and Mowing SE CR 100A and SE CR 230A

 

Work in the SW section consists of Mowing Brooker School with the Zero Turn and Mowing SW CR 100A