Tentative Work Schedule

March 5, 2019

 

Work in the NE section consists of Ditch work on NE 16th Ave. and NE 15th Ave.

 

Work in the NW section consists of Grading NW 219th St. & Dig ditch on NW 53rd (Cooksey ditch)

 

Work in the SE section consists of Patching pot holes on SE 66th and Patching troughs on SE 8th Ave., SE CR 21B, SE CR 214 and SE 9th Ave.

 

Work in the SW section consists of Grading SW 101st Ave. and SW 136th and Patching pot holes on SW CR 235

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Patching pot holes on SE 66th and SW CR 235

 

1 Squad will be Picking up trash and weed eating SW CR 18 and SW CR 227

 

1 Squad will be assisting with ditch work on NE 16th Ave. and NE 15th Ave.