Tentative Work Schedule

September 12, 2019

Work in the NE section consists of Level out drive way, Pull up boards and Cut lines on sidewalk on NE 17th Ave., Scoop ditch and Mow around culvert at curve on NE 6th Ave.

 

Work in the NW section consists of Pouring concrete for mitered ends on culverts 5916 NW CR 225 & 11177 NW CR 229 and Weed eat around signs and posts on NW CR 235

 

Work in SE section consists of SE 50th and in Crystal Lake Homesites

 

Work in the SW section consists of Grading SW 163rd, SW 168th and head into Brooker and Weed eat and Mow around Signs and Posts on SW CR 235, SW CR 231 & SW CR 237

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Assisting with traffic control Cutting lines and finishing concrete work on the sidewalk on NE 17th Ave. then traffic control for repairing mitered ends at 5916 NW CR 225 & at 11177 NW CR 229

 

1 Squad will be on assisting with traffic control for Cleaning up a ditch on NW 251st

 

1 Squad will be directing traffic for Scooping out the ditch and Mowing around the culvert at the curve on NE 6th Ave.