Tentative Work Schedule

April 6, 2023

 

Work in the NE section consists of Milling NE 17th Ave.

 

Work in the NW section consists of Grading NW 38th Ave. and NW 198th St.

 

Work in the SE section consists of Grading SE 44th Ave. (Odd Fellow Cemetery Road)

 

Work in the SW section consists of Grading SW 101st Ave., SW 106th Ave. and  SW 105th Ave. and Mowing SW CR 18 and SW CR 225A