Tentative Work Schedule

November 20, 2023

 

Work in the NW section consists of Grading both NW 196th St. roads, Fix a driveway on NW 84th Ave., Chipping limb debris on NW 193rd and Mow NW CR 225

 

Work in the SE section consists of Mowing Shoulders of the road on SE CR 100A and SE 144th St.

 

Work in the SW section consists of Grading SW 101st Ave., Chipping limb debris and Mowing on SW 75th Ave. and Patching troughs on SW CR 18