Tentative Work Schedule

September 10, 2019

 

Work in the NE section consists of Fixing the sidewalk on NE 17th Ave.

 

Work in the NW section consists of working on the ditch on NW 251st  St.

 

Work in the SE section consists of Grading SE 49th Ave.

 

Work in the SW section consists of Grading SW 101st Ave., Limerocking SW 155th, Installing pipes and Building a head wall at the entrance to Hampton Lake Boat Ramp and Mowing SW CR 235 & SW CR 231

 

 

2 of the Inmate Squads will be late coming out due to Officer's having to stay inside.  They may come out later in the day.

 

We received 1 DOC Squad with 4 people that will be handling Traffic Control and assisting with the installation of pipes and building a head wall on SW 69th Ave.