Work Schedule

 

Work in the NE section consists of Grading, Pulling ditches on NE 173rd St. & NE 12th Ave. and Scoop ditch on NE 153rd St.

 

Work in the NW section consists of Building up NW 198th St., Grading and Mowing the Shoulders of the road

 

Work in the SE section consists of Grading SE 66th Ave. and Trimming limbs on SE CR 21B near Country Caterers

 

Work in the SW section consists of Mowing

 

 

We received 3 DOC squads for a total of 22 people

 

1 squad to Weed eat a ditch on NW CR 225

 

1 squad to Weed eat the bridge on NE 17th Ave. and Weed eat Bridges, Guardrails and Crossovers on SE CR 100A

 

1 squad to handle Traffic Control on NE 153rd St.

 

1 squad from The Transition House  to put up new mailbox on NE 173rd St. and Patch pot holes on NE 179th St. & SE 28th Way