Tentative Work Schedule

July 6, 2021

 

Work in the NE section consists of Grading NE 20th Lane

 

Work in the NW section consists of Grading NW 178th Loop and NW 205th, Replacing the Crossover pipe on NW 71st Ave, between NW CR 233 and NW CR 229A and Cleaning out the Beaver Dam on NW CR 225

 

Work in the SE section consists of Grading SE 46th Loop and SE 129th St.

 

 

We received 2 DOC (BCSO-JAIL) Officers and 1 inmate and they will be Picking up trash at County Parks and Boat Ramps and assisting with Sand Bags at the Market Road pit.