Work in the NW section consists of Spreading limerock on Todd Road, Cleaning out the ditch on NW 251st St., Patching Pot Holes on NW 59th Loop and Mowing ROW on NW 185th St.

 

Work in the SE section consists of Grading SE 49th Ave.

 

Work in the SW section consists of Grading SW 66th Ave., Digging out the Ditch and Hauling off the dirt on SW 92nd St., Patching Pot Holes on SW CR 235 and Mowing SW CR 231, SW CR 18 and SW CR 231 (Dedan Loop)

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 6 Inmates

 

1 Squad and 3 Inmates will be Assisting with Opening the Gates at 3 Pipes and Filling in a wash out on a culvert in the Starke Golf and Country Club and working in the Starke Golf and Country Club area

 

1 Squad and 3 Inmates will be Weed eating around Culverts, Mailboxes, Driveways and Guardrails on NW CR 225 and NW CR 125