Tentative Work Schedule

October 9, 2018

 

Work in the NW section consists of Pulling ditches and repairing NW 75th Ave., Installing a culvert on NW 35th Ave. and Patching pot holes on NW 67th Ave., at 5392 NW CR 225, NW CR 225 and at 7141 NW 180th St.

 

Work in the SE section consists of Installing a culvert on SE 3rd Pl. in Keystone

 

Work in the SW section consists of Digging SW 161st ditch and Installing a culvert at 10338 SW 80th Pl.

 

 

We did not receive any DOC Squads due to Hurricane Michael