Work Schedule

 

Work in the NE section consists of Patching a washout and Mowing

 

Work in the NW section consists of Milling a road, Grading and Chipping limbs and brush

 

Work in the SE section consists of Grading

 

Work in the SW section consists of Lime rocking a road

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will assist with Chipping in the NW

 

1 Squad will be picking up trash in the NE

 

 

We received 1 Squad from The Transition House (3 people) will be patching washouts in the NE and SE