Tentative Work Schedule

February 24, 2021

 

Work in the NE section consists of working at the Fairgrounds

 

Work in the NW section consists of Grading NW 35th Ave. and NW 205th St. and Opening up culverts and getting water to flow on NW 198th St.

 

Work in the SE section consists of Opening up ditches to get water flowing on SE 38th Ave.

 

Work in the SW section consists of Grading SW 155th St. and SW 66th Lane and Blowing out culverts on SW CR 237

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Picking up trash and weed eating SE CR 18

 

1 Squad will be Picking up trash and  weed eating SE 161st

 

1 Squad will be Picking up trash and weed eating the Market Road pit