Work Schedule

 

Work in the NW section consists of Grading, Pulling Ditches & Milling, Ditch Work, Patching pot holes & Driveways and Mowing

 

Work in the SE section consists of Chipping limbs

 

Work in the SW section consists of Grading and Pulling Ditches

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be chipping limbs in the SE

 

1 Squad will be Picking up trash in the SW

 

1 Squad will be assisting with Ditch Work, traffic control and Picking up trash in the NW

 

 

1 Squad from The Transition House (2 people) will be patching pot holes