Tentative Work Schedule

May 21, 2019

 

Work in the NW section consists of Zipping & Grading NW 36th Ave., Tear out Head Wall and fill in with milling, Build a Head Wall and repair a culvert on NW CR 235 and    Mow NW CR 225 & NW CR 229

 

Work in the SE section consists of Grading SE 46th Loop, SE 51st, SE 53rd, SE 50th and SE 31st and Clean out ditches on SE CR 325

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be directing Traffic and 1 Squad will be assisting with the tearing out a Head Wall, filling in with milling,repairing a culvert and building a new Head Wall on NW CR 235

 

1 Squad will be directing Traffic for Cleaning out ditches on SE CR 325