May 6, 2019

 

Work in the NE section consists of Grading NE 204th and Mowing NE CR 225 and NE 216th

 

Work in the NW section consists of Grading NW 205th and NW 178th Loop and Installing an extension on an existing culvert on NW 219th St.

 

Work in the SE section consists of Installing a culvert on SE 144th St.

 

Work in the SW section consists of Grading SW 101 st Ave., SW 147th, SW 92nd, SW 136th, SW 155th & SW 160th, Mowing SW CR 231 (Dedan Loop) and Trimming trees on SW 132nd. Ave.

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Picking up trash and Weed Eating on SW CR 231

 

1 Squad will be Picking up trash and Weeding Eating on SW CR 231

 