Tentative Work Schedule

March 10, 2021

 

Work in the NW section consists of Grading NW 177th St. and  NW 53rd and Cleaning out a ditch on NW 62nd Ave.

 

Work in the SW section consists of Grading SW 101st Ave., Cleaning out the ditch on SW 194th Ave., Mowing SW CR 18, SW CR 225A, Fixing a dip in the road on SW 75th Ave. and Picking up tree debris on SW 75th Ave.

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Picking up trash and weed eating on NW CR 225

 

1 Squad will be assisting with repairing a dip in the road on SW 75th Ave.